Seal Flag Anthem
yangiliklar

The Constitution is our main dictionary

These days, our country is widely celebrating a happy date – the 30th anniversary of the adoption of the Constitution of the Republic of Uzbekistan.

In this regard, we congratulate all our compatriots on this great day.

Sincerely, Samarkand region Regional control inspection team in the field of construction

yangiliklar

New Uzbekistan massifs are being built in Urgut and Bulungur districts

In accordance with Decree No. PF-32 of the President of the Republic of Uzbekistan dated December 9, 2021 on measures to ensure the construction of “New Uzbekistan” massifs and socio-economic development of the regions, in Samarkand region in 2022 There are a total of 36 houses with 1294 apartments in 2 blocks, of which there are 18 in the “Gubdin” block of Bulung’ur district (330 flats with 5 floors) and 18 in the “Mergancha” block of Urgut district (2 with 5 floors and 16 with 9 floors. 964 houses) are under construction.

yangiliklar

THE 30TH ANNIVERSARY OF THE ADOPTION OF THE CONSTITUTION OF THE REPUBLIC OF UZBEKISTAN WAS WIDELY CELEBRATED

These days, all of us are celebrating the 30th anniversary of the adoption of the Constitution of the Republic of Uzbekistan, which is an important guarantee of our peaceful and prosperous life and a solid legal foundation.

In connection with the date, a festive event was held today in the General Directorate of Construction of Samarkand region.

yangiliklar

The next control measures were carried out in the “New Uzbekistan” massifs

“New Uzbekistan” massifs are being built by “Memor” JSC, 1 5-story residential building with 20 apartments in Bulung’ur district, Almazor neighborhood. It was found out by the inspectors that the object was not cleaned from construction waste during the next control activities in the massif, and that the builders were working without observing the rules of technical safety (without special clothing). Also, defects were made during the execution of electrical and plumbing works. Systematic control was not established by the designer and technical supervisors. Instructions were given to the officials of the construction-contracting organization to eliminate the identified deficiencies.